Energy Statements

Energy Statements

Energy Statements

Energy Statements

Many Local Planning Authorities now require the use of onsite low or zero carbon technologies within new developments as a means of providing a 10 to 20% reduction of either CO2 generated or energy consumed. These targets exceed the requirement of Building Regulations and usually require an Energy Statement to be submitted as part of the overall planning application.

Our experienced Energy Assessors will guide you through the process from concept to completion, providing clear and cost effective advice throughout.

Here are some points to consider before making a final choice of Energy Assessor:

  • We provide bespoke advice tailored to meet your needs – you can be confident that the requirements of the Planning Authority are being met.
  • All calculations, reports and support are included in our quotation – there are no hidden extras!
  • We have a track record of providing advice to clients that saves thousands of pounds - you can be sure we’re providing solutions that work for you.
  • Calculations and reports are carried out by accredited and experienced construction professionals – providing cost effective and practical solutions.

Call now to get a quote or discuss your project with one of our Energy Assessors.

FAQ

After years of anticipation, we are now one step closer to knowing where the construction industry will need to push to meet the next wave of energy efficiency targets.  The Building Research Establishment (BRE) has published a new SAP methodology – SAP 10.

SAP is the calculation used to work out a dwelling’s emission rate, compliance with Building Regulations, EPC scores and predicted fuel costs. It is a vital assessment for compliance with Part L and Section 6, and is also used as part of planning submissions (for energy and sustainability statements).

First and most importantly, this new SAP methodology is not yet in use, although it will eventually replace the current SAP, which has been in place since 2013. Our Building Regulations are still using SAP 2012, and there’s no news on when this will change. When Part L / Section 6 are updated, we’d expect the SAP 10 method to be adopted.

Highlighting some of the key points and changes in SAP 10, we’ve compiled a short list of all you need to know about how we’ll be building in the coming years:
 
1. Electric heating will be more favourable
Since the last SAP update (2012), there’s been a renaissance in the installation of wind and solar farms, giving us greener energy. So much so that the average CO2 factor from the UK’s electricity grid has halved in just six years. This means the carbon footprint of electric based heating is going to be far more favourable and could mean we start to see panel heaters becoming a favoured option for some developments.

2. On-site electricity generation will have less impact
The reduction in the CO2 factor of the electricity grid sounds like good news all round, but there is a flipside… having greener electricity means generating electricity on site isn’t going to have as big an impact as it does today. So PV systems and CHP units aren’t going to be as much help when trying to improve SAP scores.

3. Heat loss assumption for DHN will increase to 50%
Developments with district heating networks (DHN) could notice a big drop in SAP performance. Currently, default heat losses from the pipework of DHNs are assumed to be 5-20% in SAP. Going forward, a new development with no evidence of heat losses will have to assume 50%! When you consider many large inner-city schemes use DHN, CHP and PV panels, this is all going to add up to make compliance for this type of development much trickier.

4. Lower overall heat demand
To give consistent results, SAP has always worked with lots of assumptions in the background. One of these is to do with the number of hours in a day where our heating is switched on. Latest research has shown we’re in our homes less, and using our heating systems less. This will lead to lower heating demands overall. Plus, manufacturers of Wi-Fi based heating controls may be able to help improve things further if they can prove their devices mean we use our heating even less.

5. Bespoke thermal bridging encouraged
As expected, thermal bridging and fabric heat losses are being given more focus. The default thermal bridging figures are increasing by a third, which means if there are any developers still using default thermal bridging data, this is likely to push them into adopting recognised calculations. The Accredited Construction Details have been removed from SAP 10 as the ‘better case’ defaults. This is to encourage developers to research and adopt better and more specific junction details, although you’ll still be allowed to adopt ACDs if you want to.

6. Bath and shower flow rates will be considered
For the first time, SAP is going to count how many baths and showers a dwelling has, with the proposed flow rates, and whether showers are fed by electric or mains. This information will be used to more accurately work out hot water demand and could increase emissions for dwellings that are expected to use lots of water.

7. Overheating risk more likely to show on dwellings
Our lovely summer has raised the concern of overheating in our homes. SAP runs a basic check for summer overheating risks, which usually only flags up issues on heavily glazed penthouse apartments. SAP 10 is being tightened up which is likely to mean more dwellings recording an overheating risk. We’d recommend a thermal modelling assessment for a more in-depth analysis where overheating risks are anticipated.

8. Excess electricity from PV panels can be stored
A welcome addition to SAP 10 is PV storage, where excess electricity can either be sent to a battery or to heat an immersion cylinder. Currently, SAP assumes that half of the electricity generated by PVs is exported straight back to the grid.

9. Updates to reflect changes in lighting technology
Lighting technology and the efficiency of lamps has moved so fast in the last decade, that SAP hasn’t kept up. SAP 10 will record the amount and type of lamps in a dwelling. The more LED and compact fluorescent bulbs, the better result you’ll get.

Since April 2006, a SAP or Standard Assessment Procedure Calculation has been a requirement on all new build and newly converted dwellings. The SAP Calculation demonstrates that the dwelling meets the requirements of Building Regulations Part L.

To complete a SAP assessment some of the things we need to consider are:

  1. the size of your house
  2. heat losses through walls, roofs and windows
  3. orientation
  4. heating and hot water types
  5. lighting
  6. ventilation
  7. renewable technologies

The end figure is called a Design Emission Rate (DER) which is the predicted amount of kilograms of Carbon Dioxide created by your house every year, per square metre of floor space. This figure needs to be lower than the Target Emission Rate (TER). As a rule of thumb, the TER is what your house would achieve if built to the very limits of Part L Building Regulations, less 20%.